Order Definitions
Emergencies
Respond and resolve within 8 hours
- No
heat (October 15 - May 15)
- Uncontrollable
water flow
-
Gas leak/fuel smell
- Break
in (unsecured window or door)
- Lock-outs
(will be charged)
- Stopped
up toilets (if there is only one toilet in the unit
except between 11 p.m. and 7:30 a.m.)
- Sparks/smoke
(electrical & furnace)
- Refrigerator
out (room temp inside between Friday 4 p.m. &
Sunday 9 p.m.)
- Smoke
detector can't be turned off (hard wired only)
Emergencies are the only items that GMHA maintenance staff will
respond to after work hours and on weekends.
back to top
>>
Urgent
Respond and complete within 24 hours
- Stopped
up drains
- Faucet
can't be shut off (steady stream)
- Frozen
pipes
- No
electricity
- No
air conditioning (senior citizens)
- Stove
out
- Toilet
stopped up (more that one toilet in house)
- Smoke
detector does not work
- No
water (well only)
- No
hot water
Routine
Respond within 5 working days and complete within 15 working days
Move-Out Inspections And Work Orders
Elderly units completed within 7 days and family units completed
within 10 days
Annual Inspections
Failed items to be completed within 48 hours and all work completed
within 30 days